How to level a concrete floor before tiling
Using a self-levelling compound over a concrete floor: the steps, the mistakes, and when to call in a professional. Last updated 26 November 2026.
Read this first
This guide is general information. Always follow the instructions and data sheet for the levelling compound, primer and adhesive you buy. Depths, mixing water, drying times and primers differ from product to product, and the maker’s figures always win over anything here. If you are unsure, ring their technical helpline.
Do you need to level the floor?
Tiles, especially large ones, need a flat floor. Dips and humps cause lippage (tiles standing proud of each other), hollow spots and cracked tiles. As a guide, one manufacturer suggests that a flatness of no more than 5 mm under a 3 m straight edge is a standard target, and 3 mm is better for large tiles. Lay a long straight edge on the floor and look for gaps underneath. Small variations can be dealt with in the adhesive, but bigger ones need levelling.
For big changes of level, deep fills or a whole new floor surface, a sand and cement screed, or a professional, may be a better choice than a self-levelling compound.
What you will need
- Self-levelling compound suitable for the job, and for underfloor heating if you have it.
- The matching primer.
- A large clean bucket, at least 20 litres, and a drill with a mixing paddle.
- A steel trowel or a gauging trowel.
- A spiked roller, to release air from the wet compound.
- Clean cold water, and a way to measure it exactly.
- Protective gloves, goggles and a dust mask, because the powder is irritant.
Step 1: check the floor is dry and sound
Concrete must be fully cured and dry. If it is new, or you have any doubt about damp, take a moisture reading and follow the maker’s limits. If there may be no damp-proof membrane under the slab, ask the compound or membrane maker how to deal with it before you start.
Step 2: clean and repair
- Remove dust, grease, paint, old adhesive and anything loose.
- Abrade a very smooth, polished surface so the compound can grip.
- Fill large cracks and holes, and seal gaps where the compound could run away, such as around pipes and under doors.
- If the floor is old, check what is on it. Old floor tiles, vinyl and black adhesive can contain asbestos in older buildings, so do not sand or scrape them if you are unsure.
Step 3: prime
Always prime, using the primer the compound maker specifies. Let it dry completely before you pour. Cold, damp and poorly ventilated rooms take longer to dry, so allow extra time.
Step 4: mix
- Use clean, cold water. Warm water shortens the time you have to work.
- Measure the water exactly as the bag says. Too much water weakens the compound and spoils the surface.
- Add the powder gradually while mixing, then keep mixing for about 2 more minutes until it is smooth and free of lumps. Keep the paddle below the surface to avoid whipping in air.
Step 5: pour and spread
- Start at the furthest corner and work back towards the door, so you never walk through wet compound.
- Pour, and spread it with a trowel. Keep a wet edge so each batch blends into the last.
- Run a spiked roller over it straight away to release trapped air. Bubbles can spoil the surface and cause problems later.
- For large or deep areas, you may need to divide the floor into sections with battens.
Step 6: let it cure
- Keep everyone off the floor while it cures.
- Aim for a room temperature of about 20°C and good ventilation. Avoid strong draughts and direct sunlight, which can dry the surface too fast and cause crazing or cracking.
- Do not tile until the compound has fully cured. The time depends on the product and the depth, so follow the data sheet.
How much compound do I need?
Coverage is printed on the bag, usually as kilograms per square metre for every millimetre of depth. Multiply that by the area and the depth.
Example only, using a made-up figure: if a bag says 1.7 kg per m² per mm, a 12 m² floor at an average depth of 3 mm needs about 61 kg. In 20 kg bags that is just over 3, so buy 4. Always check your own product’s figure, round up, and remember the depth is not the same everywhere, because the low spots take more.
Common mistakes
- Skipping the primer.
- Adding too much water, or using warm water.
- Forgetting the spiked roller.
- Pouring deeper or thinner than the product allows. Each product has its own limits, so check them.
- Walking on the floor while it is wet.
- Force-drying it with heaters or direct sun.
- Tiling too soon.
Once the floor is flat and dry, see preparing a subfloor for tiling for the primer and adhesive steps, and use the floor tile calculator for your quantities.