Guide
Preparing a subfloor for tiling
Concrete, screed, floorboards and more: what the floor underneath needs before the first tile goes down. Last updated 26 November 2026.
Read this first
This guide is general information. It is not a specification, and it is not a substitute for the instructions on the products you buy. Always follow the adhesive, primer, board and membrane manufacturers’ instructions and data sheets. They know their products, and many will only back a guarantee if you follow their system. If you are unsure, most of them have a technical helpline, so ring it before you start.
Preparation matters more than the tiles. A cracked, loose or hollow-sounding floor is nearly always a subfloor problem, not a tile problem.
What every subfloor needs
- Strong and stable. It must carry the weight of the tiles, adhesive and foot traffic without flexing. If a floor bounces or moves underfoot, fix that first.
- Flat. One manufacturer describes a flatness of no more than 3 mm under a 3 m straight edge as achievable with skill, and 5 mm as a standard target. Large tiles need a flatter floor than small ones.
- Clean. No dust, grease, paint, old adhesive, loose material or weak patches.
- Dry. Concrete and screeds must be fully cured and dry. If you are not sure, take a moisture reading rather than guess.
- Primed where needed. Primers help adhesives grip and control how much water the floor soaks up. Which primer, and how it is diluted, depends on the surface.
Floors also need the adhesive laid as a full bed, with no gaps underneath, and powder adhesives are usually recommended over ready-mixed because they gain strength more quickly. Check the bag.
Concrete floors
Concrete is a good base once it is cured, dry and clean. The surface matters. A rough, tamped finish usually soaks up water and is primed one way, while a smooth, power-floated finish is treated as non-porous and primed differently. Some concrete has surface additives or hardeners that must be removed by grinding or abrading.
If the floor is uneven, level it with a self-levelling compound. See how to level a concrete floor before tiling. If you are not sure there is a damp-proof membrane under an older slab, or you suspect damp, get a moisture reading and follow the manufacturer’s advice on a damp-proof membrane before you go any further.
Sand and cement screeds, and other screeds
A new screed has to cure and dry before it can be tiled, and the time depends on its thickness and the conditions. Do not rush it. Different screeds, such as calcium sulphate screeds, need different preparation, such as sanding off the surface and priming, so check the screed supplier’s and the adhesive maker’s instructions.
Timber floorboards, including tongue and groove
Timber moves as it takes in and loses moisture, and tiles and rigid grout do not. That is why tiling straight onto floorboards is risky. The usual approaches are:
- Overboard with plywood. This is the most common method for a timber floor. Sources differ a little, but the most common advice is exterior-grade or WBP plywood, with 15 mm as the minimum thickness and 15 to 18 mm the usual range. Thicker plywood gives a stiffer floor. Check what your adhesive or backer board maker asks for.
- Overboard with a tile backer board. Use a floor-grade board, fixed exactly as its maker describes.
- Use a decoupling or uncoupling membrane. Some systems are designed to cope with movement. Follow the system’s instructions to the letter.
If you use plywood, these are the points manufacturers commonly make:
- Seal the underside and the cut edges before fixing, so the sheet does not take up moisture unevenly.
- Fix with screws, not nails, about 300 mm apart, with the heads flush with the surface. Choose the screw length carefully (see below).
- Stagger the sheet joints, like brick bond, rather than lining them up.
- Leave a small gap, about 2 to 3 mm, around the edge, and fill it with flexible sealant so adhesive cannot get in.
- Make sure the floor underneath is stiff and well supported, with good ventilation below it. A bouncy floor may need extra support such as noggins between the joists.
Screw length: do not go through the floor
Under a timber floor there is often a void with pipes and cables in it, sometimes only just beneath the boards. A screw that is too long can go straight through the board and into a water pipe, a gas pipe or a live cable. That is a serious risk, so work this out before you fix anything.
- Measure the thickness of the floor underneath. Board thickness varies, and in older houses it is often somewhere around 18 to 22 mm, but do not assume. Lift a board, look at a cut edge or look through an access hatch, and measure it.
- Add the plywood thickness to the board thickness to get the total.
- Choose a screw shorter than that total, so the tip stays inside the board and does not come out of the underside, but long enough to grip well into the board.
Example only: 15 mm plywood on 19 mm boards is 34 mm in total. A 30 mm screw leaves the tip about 4 mm short of the underside, and still bites about 15 mm into the board. Check your own measurements and do not simply copy this figure. If the floor is thinner than you thought, use shorter screws, and make sure the screw heads sit flush.
Before you fix anything:
- Find out where the pipes and cables run. They commonly run along or between joists and across the floor to radiators, baths and sockets. Look for markings on the boards, check from below if you can reach it, and use a pipe and cable detector.
- Do not fix over a suspected run. Keep screws away from the line of any pipe or cable you know about, and if you are unsure, lift a board and look.
- Isolate services where you can. If cables or pipes are close to where you are working, switch off at the consumer unit, and consider shutting off the water.
- Ask a professional if in doubt. A plumber or electrician can check what is under your floor before you start.
- Old nails in the boards can stop a screw seating. Remove them or fix elsewhere.
Backer boards are fixed to the maker’s instructions, which state the screw type, length and spacing. Follow those, and apply the same checks for pipes and cables.
Use a flexible adhesive and a flexible grout on timber floors. Some makers recommend a very flexible adhesive for tiling directly on boards, and a different primer too. Check the bag.
Bathrooms and other wet areas on timber
Plywood absorbs water and can swell, so some manufacturers say it is not suitable in wet areas such as showers, and that a waterproof tile backer board with a tanking system should be used instead. Others accept plywood with their tanking system. It depends on the product, so read the instructions for the tanking system you plan to use. See tanking a wet room or shower.
Chipboard and floating floors
A floating chipboard floor can flex and move, which puts tiles at risk of cracking. It usually needs to be overboarded or fixed down firmly before tiling, and the adhesive maker will have specific advice, so check before you start.
Existing tiles
Tiling over old tiles can work if they are sound, well bonded, flat and thoroughly cleaned, and if you use a suitable primer and adhesive. Tap them with a coin. Hollow-sounding tiles mean the bond has failed, and those should come up. Check the adhesive maker’s advice for your particular case.
Underfloor heating
Use an adhesive, primer and levelling compound that are suitable for underfloor heating, and follow the heating maker’s instructions on when it should be switched on, off and commissioned before and after tiling.
Old vinyl, old adhesive and old floor tiles
In an older building, old floor tiles, vinyl and black adhesive can contain asbestos. Do not break, sand or scrape them if you are unsure. Have them tested first, and use a professional if asbestos is found. Remove other adhesives and finishes properly before tiling.
Quick checklist
- Identify what is under your floor.
- Check it is strong, flat, clean and dry.
- Choose the overboarding, levelling or membrane method that the manufacturer allows.
- Use the primer and the flexible or standard adhesive the manufacturer recommends.
- Fix, prime, level and cure as instructed, and give each product its full drying time.
When the floor is ready, use the floor tile calculator to work out your quantities. If there is any structural worry, such as rot, damp or a floor that is badly out of level, ask a qualified professional before you tile.