Read this first
This guide is a general overview and is not a specification. Tanking is the one job where small mistakes can hide behind the tiles for years and then cause expensive damage. Follow the manufacturer’s instructions for the tanking system you buy, every step, with their products. If you are not confident, use a tiler or builder experienced in wet rooms, and ring the manufacturer’s technical helpline with any question before you start.
What is tanking, and why do it?
Tiles are waterproof, but the adhesive and grout between and behind them are not. Water gets through the joints and into whatever is behind, such as plasterboard, plywood, chipboard or timber, which can swell, rot or grow mould. Tanking means covering the walls and floor with a waterproof membrane, normally before the tiles go on, so any water that gets through the tiling is stopped.
Where is it needed?
- Wet rooms and walk-in showers. The whole floor and the walls throughout the wet area.
- Shower enclosures. The shower walls and the tray or base area.
- Bathrooms. Often around the bath and shower, and sometimes the whole floor. Check the system maker’s advice.
- Steam rooms. They need a system designed for them.
A British Standard for tiling, BS 5385-1, calls for a suitable proprietary tanking system in wet areas such as showers and wet rooms, and manufacturers refer to it in their instructions. Your tanking system’s own instructions will say exactly what it covers.
What you tank onto
The background has to be clean, dry, sound, stable and free from dust and loose material. What it is made of matters, and it varies by system:
- Waterproof tile backer boards are made for the job and are a common choice for walls and for timber floors.
- Plasterboard may be acceptable with some systems if it is primed, and not with others, so check.
- Plywood is suitable with some systems and not with others, because it absorbs water. Some manufacturers say to use a backer board instead.
- Concrete and sand and cement screed are normally suitable, usually after priming.
The usual steps
Systems differ in the details, but most follow this order:
- Prepare the background. Make sure it is sound, clean and flat, with the pipework and any drain in place.
- Prime where the system calls for it, and let it dry.
- Tape the corners and junctions. Corners, wall-to-floor joints, board joints, pipe penetrations and drain outlets are where failures start, so these are reinforced with the system’s tape or seals before the main coats go on.
- Fit the drain seal or mat if the system includes one.
- Apply the membrane in the number of coats and the thickness the maker states, brushed or rolled on, and fully covering the tapes.
- Let it cure for the time given before tiling.
- Tile with the waterproof or flexible adhesive and grout the system recommends.
- Seal the corners with a suitable flexible silicone, not grout.
Why you must not mix systems
Different manufacturers specify very different things. As examples, one system asks for a membrane at least 0.8 mm thick on walls and 1.6 mm on floors, and allows tiling after about 2 hours, while another asks for at least 1 mm thickness and a 12-hour wait before tiling. Neither is wrong. They are different products with different chemistry. That is why you should buy the primer, tape, membrane and sealant from one system and follow its instructions, and never mix and match.
Wet room floors and drainage
A wet room floor must slope towards the drain so water runs away and does not pool. How much slope you need, and how to build it, depends on the drain and the floor former you choose, so follow their instructions. Getting the falls and the drain connection right is a plumber’s or an experienced fitter’s job, and mistakes are hard to correct later.
On a timber floor, make sure the floor is strong and stiff enough for a wet room, and ask a professional if you are unsure. Water on an unprotected timber floor can do serious damage.
Electrics and extras
Bathrooms have strict rules for electrical work, covering lights, extractor fans, heated towel rails and sockets. Use a qualified electrician for any electrical work, and check what building regulations apply to your job.
Check before you tile
- Membrane applied at the stated thickness, with every tape and corner covered.
- Full cure time allowed between coats and before tiling, and longer in a cold or damp room.
- Some manufacturers recommend a water test of the tanked area before tiling, so check whether yours does.
- Waterproof or flexible adhesive and grout, as specified.